Building project week 10 of 22

VLUU L200  / Samsung L200 VLUU L200  / Samsung L200 VLUU L200  / Samsung L200 VLUU L200  / Samsung L200This was the week that the bad weather arrived which means that the builders cannot lay the concrete foundations and everything beyond that. As a result they have changed the programme round a bit so that they start on other work like starting to dismantle the stone wall along the side of the pavement, build an enclosure which will allow them to start work on the openings into the church (they have discovered that the gap between the inner and outer walls are filled with rubble) and prepare to start dismantling the south porch (which is why we will lose the toilet.) We had another site meeting to discuss progress and think ahead so goods can be pre ordered for the next stages and we have also looked at the visual aspect of lighting in the new extension and where we temporarily move the stone font to and where we might store the time capsule in the new extension.