Building Project week 13 of 22

VLUU L200  / Samsung L200VLUU L200  / Samsung L200Now that the concrete foundations are down the next stage is to start building up the walls at the sides and back of the extension.  The new entrance can be seen clearly marked out now and the flat access foundations down the front of the church from the car park. All the blockwork and bricks are in place to start going upwards and the boundary wall is being built. The kitchen and toilet have now been removed in preparation for the re plan of those areas. Even the PCC meeting was held in the main church and we all had to wear thick coates. Our FUNdraising team raised a massively impressive £ 845 (plus procedds from an ongoing raffle) for our annual Cabaret. Thanks to all who arranged it, contributed to it and bought tickets and food/drinks on the night.VLUU L200  / Samsung L200 VLUU L200  / Samsung L200